The connection, control and extension cables are robust yet flexible so the rigger can connect the motors in a quick and easy way. All cables have CEE plug connections and are suitable for operating temperatures from -25 °C to +55 °C.
Manual trolley
Inquire for price
Description
GIS manual trolleys are easy to set up and enable manual shifting of loads up to 6300 kg on steel beams. The flange width is continuously variable due to a new adjustment system and can be easily fixed using the interlocking function.
Description
GIS manual trolleys are easy to set up and enable manual shifting of loads up to 6300 kg on steel beams. The flange width is continuously variable due to a new adjustment system and can be easily fixed using the interlocking function.
Related products

Geared limit switch for LP
Inquire for price
With the integrated gear limit switch the upper and lower end position of the load hook can be adjusted easily and precisely. To increase safety, two additional emergency stop switches are available.

Handle for LP
Inquire for price
As a climbing lift, the electric chain lift can be lifted out of the transport packaging with its own chain. If rigs have no power available on site, the chain hoist can be lifted using convenient handles.

Secondary brake for LP
Inquire for price
Each D8 chain hoist can be optionally equipped with a second, independent brake. In a few simple steps it is mounted on the existing drive shaft just behind the first brake. It is available as an optional extra with brake monitoring.